The first 2 coats of sealer are on, enough to protect the
timber. The top coats will go on once all the work is complete and that could
be months away.
![]() |
Ready for the sink and plumbing. |
![]() |
Sink in. |
I do a huge variety of tasks in my kitchen and have found the way to
make each more efficient is to create many different workstations throughout
the room. I work out what I’m going to do most frequently then give those
things priority. My main workstations are ready to go at any time, these are
bread making, meals prep, farm produce processing (mostly vegetables at the
moment, but when we are milking it includes milk, cream and butter). Areas that
are ready to go with minimal effort, general baking, preserving (canning,
bottling, drying, freezing etc), cheese making and brewing. There are also
things I do at longer intervals like soap making and butchering.